Restore Production. Extend Life.
Comprehensive well intervention and workover solutions to restore, enhance, or extend well productivity throughout its entire lifecycle — from routine maintenance to complex recompletions.
Maximizing Well Potential
Charlvon delivers comprehensive well intervention and workover services designed to restore, enhance, or extend well productivity throughout its entire lifecycle. Whether addressing declining production, mechanical failures, or reservoir changes, our integrated approach ensures optimal outcomes.
Our workover operations range from routine maintenance and tubing replacements to complex recompletions and sidetracks. We deploy experienced workover crews with modern rigs and specialized equipment to handle any well condition safely and efficiently.
With a proven track record including the Igbuku-1 workover campaign and Sapele-7 workover for SEPLAT, we have demonstrated our ability to execute complex interventions with zero incidents and minimal downtime.
Intervention Services
Well Cleanouts
Sand, scale, and debris removal to restore wellbore flow capacity
Tubing Replacement
Pulling and running new production tubing for well integrity restoration
Perforation & Stimulation
New zone perforation and acid/matrix stimulation for production uplift
Plug & Abandonment
Safe well decommissioning with regulatory-compliant barrier placement
Recompletion
Upper or lower completion replacement for changed reservoir conditions
Sidetrack Operations
Window milling and directional drilling for new reservoir targets
Workover Equipment & Capabilities
Modern rigs and tools for efficient well intervention operations
Workover Rigs
Mobile and skid-mounted rigs for quick mobilization and demobilization
Snubbing Units
Live well intervention capability under pressure without killing the well
Fishing Tools
Specialized retrieval systems for stuck or dropped downhole equipment
Milling & Cutting
Window milling, casing cutting, and section milling for sidetracks
Well Control Equipment
BOP stacks and choke manifolds for safe pressure management
Experienced Supervisors
Certified workover supervisors with decades of field experience
Proven Track Record
Charlvon has successfully executed workover operations for major clients including Pillar Oil (OML 56) and SEPLAT Energy (OML 41). The Igbuku-1 campaign involved drilling out cement plugs, CBL evaluation, perforation, production testing, and well suspension — all completed without incident.
Our workover teams maintain a zero-incident safety record with comprehensive risk assessments, JSA procedures, and continuous safety training. We deliver interventions that restore production while protecting personnel, equipment, and the environment.
