OML 49

Oghareki-3 (NEPL/Chevron) Oghareki 3 was in Oghareki/Okwefe field and was a fresh well. The pilling hammer operation was also done by Charlvon to a depth of 300ft. This well was drilled to a total depth of 12,200 Ft-MD. And saw Charlvon deliver the well with a rig efficiency of 95%.